Skip to main content
allvswhole-home customization

allvs (UK) whole-home customization

Knowledge Sharing

allvs pursues ultimate perfection, maintaining international leadership in environmental protection, technology, and aesthetics. Top-quality material selection and perfect design pursuits, unlike any brand you have ever seen. From inside to outside, every detail is fascinating. allvs deeply considers and defines a high-end aesthetic more suitable for Chinese people and integrates more intelligence into aesthetic design.

Knowledge Sharing

How to coordinate plumbing and electrical work with whole-home customization? Point locations should be determined together with cabinet drawings

Direct Response

Plumbing and electrical renovation cannot be separated from whole-home customization. Outlets, water supply and drainage, LED strips, appliances, robot vacuum cleaners, water filtration, and access panels should all be determined in sync with the cabinet structure.

Factory Production and Point Accuracy
The earlier plumbing and electrical points align with cabinet drawings, the less rework needed later.

Plumbing and electrical work are not independent trades

Kitchen plumbing, built-in refrigerators, steam ovens, dishwashers, robot vacuums, TV cabinets, nightstands, and in-cabinet lighting all relate to plumbing and electrical points. Construction without cabinet drawings easily leads to position conflicts later.

Documentation is mandatory before sealing trenches

It is recommended to mark lines on-site, take photos, record circuits and pipeline routes, with verification by the homeowner, designer, or project manager before sealing trenches. Once concealed work is sealed, accountability and repair costs increase significantly later.

allvs project communication suggestions

If preparing for allvs whole-home customization, confirm major cabinets, kitchen appliances, water filtration, lighting, and maintenance methods before plumbing and electrical work, making the point location drawing part of the contract and acceptance criteria.